Overview

Quick Details

Place of Origin:

Zhejiang, China

Brand Name:

EPT

Warranty:

1 year

After-sales Service Provided:

Field installation, commissioning and training, Field maintenance and repair service, Video technical support, Online support, Engineers available to service machinery overseas, Free spare parts, No after-sales service

Applicable Industries:

Building Material Shops, Machinery Repair Shops, Construction works, Energy & Mining

Application:

shantui bulldozer

Part name:

gearbox

Part number:

154-15-41002

Condition:

100%new

Delivery:

1-2days

Quality:

original parts

Packaging & Delivery

Packaging Details
2. ShippinG: DHL, FEDEX, UPS, TNT”>1. Packing: Carton box

2. ShippinG: DHL, FEDEX, UPS, TNT
Lead Time
:
Quantity(Pieces) 1 – 100 >100
Est. Time(days) 1 To be negotiated

Online Customization

Product Description

SHANTUI SD22 bulldozer spare parts transmission assy 154-15-41002 gearbox for sale

We deal in spare parts for SANY, XCMG, XGMA,SDLG ,LIUGONG,SEM,YTO,SHANTUI ,WEICHAI ,YUCHAI ,SHANGCHAI,XICHAI,FAW,HOWO,SHAANXI,DONGFENG,and etc for 7 years and export our products Abroad for a long time
We have good price and quality
We hope to build good cooperation with you

SHANTUI SD13 SD16 SD22 SD23 SD32 SD42

SHANTUI SG16 SG18 SG21 SR20 SR22 SR23 SR26

SL20W SL30W SL50W SL60W

PC228US PC200-7 PC220-7 PC220LC-7 PC300-7 PC360-7 WA380-3 WA380-6

LG918 LG930 LG933 LG936 LG938 ZL40F LG946 LG952 LG953 LG955 LG956 LG958 LG959 LG968 

LW300F LW500F LW300K LW400K LW500K ZL30G ZL40G ZL50G LW420F

XG956 ZL50C XG932 XG951 XG955 XG953 XG918 XG958 XG962 XG942

ZL50C ZL50D ZL30E CLG835 CLG836 CLG852 CLG855 CLG856 CLG862

LG855B LG833B LG835 LG816G ZL50G LG853 LG856B LG850 CDM833 CDM835E CDM856 

SEM650B SEM660B SEM618B SEM658 ZL50F SEM652 SEM626B

FL920F FL933 FL936F FL953 FL953H FL955F FL956F FL958G FL966F

CG932 CG938 CG956 CG955 ZL50 ZL30 CG946G CG962H

WD615 WP12 WP10 WP7 WP6 WD12 WD10 TD226B YZ4D DHD10G

YC6108G YC6B125 YC4108 YC6B120 YC4D80 YC4B90 YC6J125Z

C6121 D6114 D9 D4114 C6135 SC11CB SC5D SC8D

4BTA3.9 6BT5.9 6CTA8.3 6CT9.5 QSB4.5 QSB6.7

1. Spare parts: Usually, Upon receipt of payment, IN-STOCK parts will ship on or before the next business day. If not in stock, the spare parts will be dispatched within 3-5 days.

2. Whole machine: Usually, the delivery time is about 15-30 days..

3. Though we pride ourselves on fast order processing and shipping, sometimes delays may occur. Please be patient, and keep in touch with us via email.

OUR COMPANY

Contact Us